Completed a consumer unit upgrade to the 18th Edition with a Surge Protection Device (SPD). Installed trunking to tidy up cables and used black conduit externally to route the earth cable. Upgraded the meter tail and earth bond. All work has been signed off, with certificates and Part-P building control notification issued.